our blog is now getting over 100 views a week!
06 Friday Nov 2015
Posted in Uncategorized
06 Friday Nov 2015
Posted in Uncategorized
06 Friday Nov 2015
Posted in Uncategorized
05 Thursday Nov 2015
04 Wednesday Nov 2015
Posted in Uncategorized

A scene in our driveway. In the centre is a jacaranda tree with the mauve blossoms (a tree which almost a symbol of Los Angeles), on the right is a pine nut tree, to the left an avocado tree and behind is a cabbage tree, which although it looks nice, gives us the constant chore of picking up the dead fronds from the pavement, and these don’t decompose…
02 Monday Nov 2015
Posted in Uncategorized
Like the Sandhills Expressway — a.k.a. the Kapiti Expressway and the Steven Joyce Autobahn — the 27 km motorway from Tawa on the existing motorway to Porirua, north of Wellington, will shorten journeys to and from Waikanae. An official commencement ceremony was held on 22 October.
Looking at the maps, the 27 km doesn’t look to be shorter in terms of distance, but because it bypasses Paremata, Plimmerton, Pukerua Bay and Paekakariki, and should be 100 km/h or 110 km/h all the way, it should cut 10-15 minutes off the road journey. Thus in non-peak times the trip could be down to 30 minutes.
The highway has been on the drawing board for a lot longer than people think, at least 50 years, and will cost an estimated $850 million — thus combined with what is being spent on the Sandhills Expressway, puts the total cost to over $1.5 billion (and some people complain about a mere $26 million being spent on the flag referendum?)
The present pro-trucking lobby government sees this road as further increasing the time advantage for trucks over trains, although because it incorporates some fairly steep gradients, they aren’t going to gain in terms of fuel consumption.
At the Paekakariki junction point the two Expressways will effectively connect up.
Paekakariki will be about 2 km from the start/end point of the Transmission Gully route although, unlike Paraparaumu and Waikanae, it has no businesses on SH1, except for the Fisherman’s Table restaurant.
The completion date for Transmission Gully is given as 2020, about 3 years after the Kapiti Expressway.
01 Sunday Nov 2015
Posted in Uncategorized
On the Paul Henry show on TV3/Radio Live this morning, Michael Barnett was asked whether he considered the ‘super city’ was a success or a failure and he replied that it was a failure. Micheal Barnett posted ‘diplomatic’ comments here.
This is a telling condemnation, as business was one of the major reasons for support of the Wellington ‘super city’, which was dropped by the Local Government Commission in June.
The reasons can be simply stated as those that we have given in earlier posts this year — super bureaucracy by bureaucrats remote from the people they administer, an all-consuming focus on the central business district to the exclusion of the rest, and (naturally) super taxes (rates).
01 Sunday Nov 2015
Posted in Uncategorized
Not much of it is visible, but in the full-size version of the pic you’ll see works towards the right hand end of this ridge line.
The power pylons carrying the high tension lines that locals have wanted to see buried underground in conjunction with the Expressway works are also visible (see earlier posts). However, we think the likelihood of Transpower heeding this call now is remote. Being government owned it has the same orders from the government to make maximum profits that other state-owned enterprises have and doesn’t want what it considers unnecessary expense.